Excavation Complete at Avani 2

October 2017 Construction Update

Since our last update for Avani 2 our on-site teams have completed excavation, and two construction cranes are now up and running. The crews are implementing drainage for the under slab, completing the concrete pour for the P3 parking level slab and walls, as well as the P2 suspended slab.
 

From the Tridel webcam:
image1.jpg
 

Attachments

  • image1.jpg
    image1.jpg
    88 KB · Views: 1,007
https://www.tridel.com/blog/ground-floor-avani-2-now-formed/

Ground Floor of Avani 2 Now Being Formed

January 2018 Construction Update

Our on-site Construction teams have complete the concrete pour of the parking garage and are now working on forming the ground floor of the community. Plumbing and electrical rough-in work has started within the parking levels and the storm connection to the city sewers is complete.
 
current state, for reference:

image1.jpg


https://www.tridel.com/blog/avani-2-construction-update-january-2019/

Avani 2 Construction Update – January 2019
IMG_0801-846x495.jpg


Avani 2 has Topped Off!
We are pleased to share that the roof slab at Avani 2 at Metrogate has been completed and the community has “topped off” at its full height. This is an important milestone in the construction of any community. It signifies the end of forming and brings occupancy for our homeowners one step closer.

Meanwhile, inside….
Work has been progressing well on the interior finishes of the suites. Finishes begin on the ground floor and move upwards with trades following each other up the building. Currently, suites are being framed on the 19th floor. Framing is the installation of the metal studs (like the wooden 2 by 4’s used in low-rise construction) which will become the frame of the interior suite walls. As the suites are framed, electrical and HVAC rough-ins have begun on the 18th and 16th floors, respectively. Plumbing rough-ins continue on the 14th floor and drywall is being installed on the interior suite walls on the 11th floor. Taping of the drywall is following closely behind.
 
Yesterday:

DSC08350.jpg
DSC08351.jpg