valkoholic
Active Member
It is the permenant ramp to the existing loading dock.
shots taken from outside presentation centre ~
Northwest View
Southwest View
The covered walkway they built on Yonge St. is really too narrow considering the pedestrian traffic. I do hope they need all of that setback.
I doubt you heard anything related to the construction site. It was probably a garbage truck. Work generally starts at 7am on the nose; the dump trucks will line up on Yonge St. as early as 6:30am, I believe, but definitely not at 4am.