khris
Senior Member
Interesting! Thanks for the answers
This is for the connection between College Park and Aura
...
incidentally, does anyone know if there are plans to connect Aura with Atrium on Bay, thereby having the PATH network reach College Street?
incidentally, does anyone know if there are plans to connect Aura with Atrium on Bay, thereby having the PATH network reach College Street?
What are those big pieces of steel with what looks like rivets, for? Are they located there because there will be a heavier load on that particular section?
Wow, that PATH map is so inaccurate it borders on offensive. If you look at the link below, it misplaces the location of the Condo at College/Yonge. Well, it puts the location in the right area (technically) but that is only because it got Gerrard and College street wrong, and instead should have accurately labelled them Edward and Gerrard. It doesn't show College at all. It keeps Elm off the map and makes it appear as if Edward (they call it Gerrard) and Gerrard (they call it College) are one building apart. They also show a dotted line where BA was filled in but not a dotted line for the proposed Aura connection? This is a horrible representation of geography and completley lies about the neighbourhood.
http://collegeparkcondos.com/thepath.html
Aura looks to be still fighting to get completely above ground along the eastern portion of the site.
i cannot say wow enough! wow. some incredible stuff happening. This thing is sealing up the "ground level" title with each and every day. incredible stuff. it seems like yesterday when we still had a parking lot! wow. good job construction team! lets build this