Toronto 88 Bathurst | 68.3m | 17s | Hines | 3XN

Aug 27, 2023

9B664E30-02F4-4A9C-896B-CBC4D3B03DB2_1_201_a.jpeg



740483B3-0E81-4007-830A-BA3F8E44AE61_1_201_a.jpeg



203D9382-7280-4B36-91FD-58E46B3436D2.jpeg



FA9B4923-15A3-4795-8F62-66086819E452_1_201_a.jpeg
 
Four photos from today. Second floor glazing detail, then overall views from the south, north and above.

20230909_140019.jpg


20230909_140008.jpg


20230909_094534.jpg


20230909_084721.jpg
 

Attachments

  • 20230909_135404.jpg
    20230909_135404.jpg
    226.7 KB · Views: 60
  • 20230909_134858.jpg
    20230909_134858.jpg
    322 KB · Views: 61
  • 20230909_134704.jpg
    20230909_134704.jpg
    268 KB · Views: 65
  • 20230909_100306.jpg
    20230909_100306.jpg
    371 KB · Views: 57
  • 20230909_134803.jpg
    20230909_134803.jpg
    241.9 KB · Views: 59
I'm going to be so happy when the Danish Design Centre opens up in the commercial space! lol
 
Forming has reached the Eighth Floor at the north end of the building. Five photos, from the south, the north, the north-west, above, along with a detailed photo of the new Eighth Floor form work at the north end.

The pictures were taken at different times today, with the two from above being later in the day than the others. The progress in the new Eighth Floor section between the photos shows how quickly things are moving along for this project.

20230914_150935.jpg


1000000999.jpg
1000000998.jpg

1000001001.jpg


1000001002.jpg
 