Toronto 75 Broadway Avenue | 117.34m | 38s | Hazelview | WZMH

Taken 6-28-2022

DSC04696.JPG


DSC04697.JPG


 
The Crane has arrived to bear us with good judgement ;)

I took this yesterday. Speaking of cranes, I believe the crane for the Hampton will be taken down on Wednesday, the street is closed for 2 days, and that's likely part of the reason at the very least.

20220725_154348.jpg
 
I know I have posted about this before but... this project has not 1 but 2 massive, 300dpi print quality renderings in its database. Why?

Here's a low-res screenshot of the actual size of the 15mg! print quality database rendering... which actually takes a while to download just for viewing, despite a Bell Fibe high-speed connection lol.

15mg-jpeg-screenshot-actual-size.jpg


Here's a resampled jpeg that is 1/36th of the size. Just sayin' ;)
UT-75-Broadway-resampled-cropped.jpg
 

Attachments

  • UT-75-Broadway-resampled-cropped.jpg
    UT-75-Broadway-resampled-cropped.jpg
    387.6 KB · Views: 104
@3Dementia

Hello!

I have updated the renderings with the appropriate pixel size now in the database.
I sent you that "love" emoji too soon... 2.1mg is better but it ain't low res (pics only need screen resolution on a website... mine posted above is 400kb) ;)
 

Back
Top