Toronto 57 Brock | 24.69m | 7s | Block | RAW Design

SMT with the full story and photos from the ground breaking ceremony:

 
20191208_100542.jpg
20191208_100632.jpg
 
Moving slowly but there has been some progress. Hopefully with the foundational pieces in place they can start to climb at a faster rate. But overall this has a vibe of one of those slower construction projects that may move at a floor per month.
 

Back
Top