Toronto 550 Wellington West and 1 Hotel | ?m | 15s | Freed | a—A

July 20th

I couldn't figure out what building this was until I got flipping through this post. From July 20th.

Click on the thumbnail to enlarge, then click again on the image for full size.

 
Thanks for the pics, MikeMang. I really like this project, especially the Thompson Hotel portion. The mullion-free glazing is luscious.
 
Always nice to come back from the cottage and see photo updates! Glad that they're moving along on this - hopefully we're all in by our expected Occupancy Dates.
 
Aug 7

Got side track and never finish shooting the rest as well 75 Portland

IMG_aug-08-09-0024.jpg


IMG_aug-08-09-0127.jpg
 
Photo Update August 9th

I was in the area so I quickly snapped a few. Coming along!
 

Attachments

  • IMG_1249.jpg
    IMG_1249.jpg
    38.3 KB · Views: 220
  • IMG_1250.jpg
    IMG_1250.jpg
    68.7 KB · Views: 187
  • IMG_1251.jpg
    IMG_1251.jpg
    61.6 KB · Views: 202
  • IMG_1253.jpg
    IMG_1253.jpg
    72.7 KB · Views: 326
  • IMG_1256.jpg
    IMG_1256.jpg
    61.4 KB · Views: 207
  • IMG_1257.jpg
    IMG_1257.jpg
    50.1 KB · Views: 235
  • IMG_1258.jpg
    IMG_1258.jpg
    55.7 KB · Views: 216
  • IMG_1261.jpg
    IMG_1261.jpg
    33.9 KB · Views: 196
Nice thanks for the pics! Did you notice all the grass piled up on the ground level on the wellington side? As soon as they start putting that up the building will really feel like its finishing up!
 
The glass on the Thompson Hotel potion of the project is wonderful, even more so than Lightbox and the Ritz podium IMO. Thanks for the great pics.
 
I know its been said a million times on this forum but those rickity-ass poles and power lines need to go.
 
Are there any renderings of how the Crangles part of the building is going to be integrated into 550 wellington? The framework is there, but I don't quite get why the glazing goes so far down that it goes behind that framework... doesn't that mean there will be an odd gap between the structures?
 

Back
Top