Wow! If they took down the crane how are they going to get the windows to the top two floors? I guess they can use the elevator?

Question: Do you guys think they will finish this building on schedule.

Nice pic jasonzed!
 
As as aside, I wonder if rising energy costs will kill off glass walls and herald a return to tall narrow windows surrounded by some well-insulated brick?

This just might be a glimpse of the not too distant future......
 
As as aside, I wonder if rising energy costs will kill off glass walls and herald a return to tall narrow windows surrounded by some well-insulated brick?

This just might be a glimpse of the not too distant future......

there are types of vacuum insulated glass that insulate just as well as standard brick walls
 
Last edited:
there are types of vacuum insulated glass that insulate just as well as standard brick walls


yes but not usually used by developers because of cost, plus AFAIK the aluminum frames used for condos aren't as well insulated as the vinyl framed casements.
 
The Red and grey brick is a nice touch! It will be interested to see pictures of the whole west face if possible once the bricking is done. As for the windows I think you see brick here because Sorbara wanted to keep the building blending in with the rest of the street. I am not sure if you are going to see condos go back to brick. Maybe on some smaller projects.
 
Hey Red Mars, were you following me or was I following you on May 25?? My shots from May 25 and its nice to see real bricks being use
5760257711_6d9d47a0af_b.jpg


5760807138_f1daebe098_b.jpg


5760255531_f5f3f41c0e_b.jpg


5760253069_e82897ceb8_b.jpg


5760251875_05d515b7a9_b.jpg


5760245049_6f0bd6e92b_b.jpg


5760246307_bdc19210bf_b.jpg


5760804718_f66aa97c2c_b.jpg
 
Hi Drum118

I took my shots around 6 pm.
 

Back
Top