Toronto 305 Roehampton | 42.97m | 14s | KG | Kirkor Architects

People are slowly moving in. although landscaping hasn't started yet and the main drive-way just got completed.

IMG_20150514_175932.jpg



IMG_20150514_175938.jpg
 

Attachments

  • IMG_20150514_175932.jpg
    IMG_20150514_175932.jpg
    1.5 MB · Views: 1,346
  • IMG_20150514_175938.jpg
    IMG_20150514_175938.jpg
    1.9 MB · Views: 1,350
The Pool/Recreation Building:

IWC578u.jpg


Sidewalks:

L9NVIC6.jpg


uKa61eq.jpg



Sidewalks still need a little bit of work. I like the fact the building is set back from the road allowing for sidewalk widening. There are little studs on the crosswalk at Rawlinson and Roehampton which is a very nice touch seeing as students at Northern often cross there.

I hope that the sidewalk on Rawlinson is widened more. Otherwise, this street is going to look really good once trees mature.

----
Overall I must say that this project changes the feel of the block completely. The building itself is a good contrast of styles with the 50s style apartment blocs, but the updating of the public realm here is well done and makes walking between these buildings to cut through the bloc a pleasure rather than a hassle.

I hope Midtown in Focus looks at ways of connecting these midblock walkways better with Mt. Pleasant and Eglinton so everyone can actively walk by rather than just local residents.
 
Last edited:
Some landscaping has been added. Will take a while for the trees to grow to the size of the ones that were cut down...

299.2.jpg
299.3.jpg
 

Attachments

  • 299.2.jpg
    299.2.jpg
    1.6 MB · Views: 923
  • 299.3.jpg
    299.3.jpg
    1.8 MB · Views: 958
The rec centre is complete and is open to tenants. Landscaping updates in front of the other two rental buildings belonging to the same property management is also being done now.

IMG_20150814_082434.jpg
IMG_20150814_082451.jpg
 

Attachments

  • IMG_20150814_082434.jpg
    IMG_20150814_082434.jpg
    935.3 KB · Views: 925
  • IMG_20150814_082451.jpg
    IMG_20150814_082451.jpg
    1.3 MB · Views: 935
The landscaping and sidewalks seemed to be complete last time I walked through here.

Anyway, there are two database files for this project, 299 Roehampton and 305 Roehampton. I'm guessing it is a result of a glitch in the site conversion?
 
Anyway, there are two database files for this project, 299 Roehampton and 305 Roehampton. I'm guessing it is a result of a glitch in the site conversion?
This is a nice building on the inside....but the address is 305 not 299.

Fixed. 305 is a new address on the 299 Roehampton site, hence the address that was originally tied to this thread.

42
 
Canada Day

And this is how this project looks a year later. Sidewalks and landscaping complete and growing:

IMG_20160701_105907.jpg
IMG_20160701_105940.jpg
IMG_20160701_110004.jpg

IMG_20160701_105959.jpg

IMG_20160701_110049.jpg

IMG_20160701_110342.jpg
IMG_20160701_110346.jpg
 

Attachments

  • IMG_20160701_105907.jpg
    IMG_20160701_105907.jpg
    797.1 KB · Views: 625
  • IMG_20160701_105940.jpg
    IMG_20160701_105940.jpg
    746.8 KB · Views: 576
  • IMG_20160701_110004.jpg
    IMG_20160701_110004.jpg
    899.9 KB · Views: 613
  • IMG_20160701_105959.jpg
    IMG_20160701_105959.jpg
    754.7 KB · Views: 568
  • IMG_20160701_110049.jpg
    IMG_20160701_110049.jpg
    992.6 KB · Views: 607
  • IMG_20160701_110346.jpg
    IMG_20160701_110346.jpg
    701 KB · Views: 594
  • IMG_20160701_110342.jpg
    IMG_20160701_110342.jpg
    918.7 KB · Views: 583
June 30th - 2017:

IMG_20170630_121131.jpg


My favorite piece of infill in the area.

What should be done is to improve the mid-block pedestrian connections between Eglinton and Roehampton. The connection should also extend all the way to Mt. Pleasant, which is currently fenced off by this (and the adjacent) building.
 

Attachments

  • IMG_20170630_121131.jpg
    IMG_20170630_121131.jpg
    1,003.7 KB · Views: 518

Back
Top