Toronto 252 Church | 166.1m | 52s | CentreCourt | Arcadis

IMG_4661.jpeg
 
Today. Mechanical level in progress. Neither cranes seen here are assisting the construction. The one in the foreground belongs to JAC Condos and the one that appears to be sitting on top of the building is actually much further south, one of CIBC Square south tower’s.

IMG_3110.jpeg
 

Back
Top