Yesterday morn...the last building remains but theres now a slightly bigger hole there as of posting this.
20230714_095000.jpg
20230714_095015.jpg
20230714_095052.jpg
 
I took these within the last few hours, except for the first image, captured in the morning. I used some camera setting on my phone to try and capture something decent of the site as it is now. The last building on site is on its final legs.
20230721_095445.jpg
20230721_185721.jpg
20230721_185744.jpg
20230721_185756.jpg
20230721_185801.jpg
20230721_185826.jpg
20230721_185849.jpg
20230721_185935.jpg
20230721_185853.jpg

EDIT...here, this image refused to upload
1689995280612.jpg
 
Last edited:
Not sure what the smaller drilling equipment (second photo- north part of site) is doing, although the site had at least three of them at one time, so maybe that is almost complete. The first photo shows a large shoring equipment (south part of site), which I first saw about a week ago and now some excavation has started (large mound of earth can be seen) so looks like this project has started in earnest, unless Northern Light tells us the shoring permit has not been issued?

20231027_141442.jpg


20231027_141531.jpg


 
Not sure what the smaller drilling equipment (second photo- north part of site) is doing, although the site had at least three of them at one time, so maybe that is almost complete. The first photo shows a large shoring equipment (south part of site), which I first saw about a week ago and now some excavation has started (large mound of earth can be seen) so looks like this project has started in earnest, unless Northern Light tells us the shoring permit has not been issued?

View attachment 516101

View attachment 516102
The smaller drill rigs are drilling a geothermal borefield, the building’s heating and cooling systems will be connected to the geothermal borefield beneath the building
 