Toronto 160 Front West | 239.87m | 46s | Cadillac Fairview | AS + GG

Thu Jul 16, 2020

C36CF6ED-C083-4C42-925D-3095E56BDC55_1_201_a.jpeg



AE635949-7CF2-4D3B-955A-B00B87151190_1_201_a.jpeg



C8824EB5-64EE-47EA-BB47-9FF5BDB210CC_1_201_a.jpeg



D33E51EF-9296-4F91-BC6F-12C27FBFEEFC_1_201_a.jpeg



D5820677-9F88-4BB1-B72B-8AD77A3BD585_1_201_a.jpeg



7AF1BFE0-F761-48DE-9007-75A0B113424F_1_201_a.jpeg



1B94CB44-F901-4A61-8A78-31A4FCE87A5C_1_201_a.jpeg



9670996F-F5AE-4B7C-A3C3-7ADA0F24F9E6_1_201_a.jpeg



21EEBF49-2396-4AE9-9B65-A4749B9C06FA_1_201_a.jpeg



87B9E1A5-AA76-441D-B9EA-CF70E5168008_1_201_a.jpeg



EA3B8225-A38B-4D84-A0ED-370EFAFAC20D_1_201_a.jpeg



1A17103A-E85F-4661-8187-780D644DA10B_1_201_a.jpeg



B64D9862-9477-40B5-8EE8-8C78FDF798B4_1_201_a.jpeg
 
International Guitar Underpinnings? Interdependent Gelform Umbrellas? Inflamed Goat Udders? Illegitimate Gas Utilities? Island Guest Units? Integrated Garbage Uplinks? Ill-Gotten Users? Instant Gyoza Unctions? Inferred Gastric Ubiquities? Insulated Guppy Undergarments? Iridescent Green Ushers? (No, nothing so obvious.)

Strangely, acronyms just are not helpful on a public forum where members may not actually spend their days on construction sites.

42
I believe ProjectEnd was pointing out that the Glass Insulated Units that meet and continue briefly above the roof were damaged. The damage does seem minimal compared to what I would imagine for a crane collapse.
 
I was under the impression that tower cranes had working space limiters that prevented just this sort of thing from happening?
 
I'm glad no one was injured in this.

It looks like someone is in for some real expensive crane rental bills....hopefully that someone somehow ends up being Cadillac Fairview.
 
Could have been way worse. Nobody died, nobody was seriously injured. Minimal damage as well. Might delay things for a week but overall not a huge fiasco that it easily could have been.
 
I watched the CP24 video. About 6-8 glass panels on the neighbouring building seem to have cracked.

Maybe it's no big deal that building has been cracked. Isn't it set for demolition anyway? Maybe the cracking of those glass panels was just an unorthodox way to commence the demo to make way for this new building:

 
Why would you want the teachers pension fund to suffer high bills?
You're playing semantics here. Yes the OTPP fully owns Cadillac Fairview, but it's a subsidiary company. Thus, CF is responsible for their own daily operations and costs. At the end of the day it could be that only the CF division suffers a small hit, not OTPP as a whole.
 
You're playing semantics here. Yes the OTPP fully owns Cadillac Fairview, but it's a subsidiary company. Thus, CF is responsible for their own daily operations and costs. At the end of the day it could be that only the CF division suffers a small hit, not OTPP as a whole.
If a division or a subsidiary makes a loss or a profit, it will be reflected in the accounts of the 'owners'. I doubt the cost of extra crane rental and repairs will make any real difference to OTPP but ......
 
If a division or a subsidiary makes a loss or a profit, it will be reflected in the accounts of the 'owners'. I doubt the cost of extra crane rental and repairs will make any real difference to OTPP but ......
Ultimately at the end of the day, this is all true.
 
It may be time for some perspective here. Tower cranes are normally provided by the forming contractor on the job. The forming contractor is selected and contracted by the General Contractor, in this case PCL. Insurance - bonding and liability - would be normal. A responsible client would not hire a construction company without having insurance in place.

Without any specific knowledge of the details in this situation, I would expect that the client, Cadillac Fairview, and ultimately OTPP, should not be too exposed. I doubt that CF / OTPP would have tried to save a few dollars by requesting PCL to cut out insurance coverage on this project, and pass the savings on to them.

So unless PCL did something to contribute to this accident happening, responsibility would probably rest with the forming contractor - they would either own or have leased the crane in question, and would have been the ones responsible for its operation. And again, I would expect that they would carry liability insurance for their role in this project.
 