Downtown Toronto
Active Member
Member Bio
- Joined
- Oct 19, 2016
- Messages
- 517
- Reaction score
- 1,287
- Location
- Yorkville/Downtown Toronto
June 11 2019.
Pedestrian walkway container tunnel fully removed now. The city docs state that the tunnel should have been removed on Feb 7th 2019 but received an extension in Feb 2019 for the construction staging area through April 2020
Pedestrian walkway container tunnel fully removed now. The city docs state that the tunnel should have been removed on Feb 7th 2019 but received an extension in Feb 2019 for the construction staging area through April 2020
Attachments
Last edited: