Toronto 128 Hazelton Avenue | 37.9m | 9s | Mizrahi Developments | AUDAX

June 11 2019.
Pedestrian walkway container tunnel fully removed now. The city docs state that the tunnel should have been removed on Feb 7th 2019 but received an extension in Feb 2019 for the construction staging area through April 2020
20190611_112234.jpg
Screenshot_20190615-103213_Adobe Acrobat.jpg
 

Attachments

  • backgroundfile-130364.pdf
    278 KB · Views: 301
Last edited:

Back
Top