Toronto 100 Queens Quay at Sugar Wharf | 117.34m | 25s | Menkes | B+H

B9759606-E96B-41A2-AB6D-2234928C3D6E.jpeg
 
The signs outside this development say "Available 2021". Given the speed of this, and the fact they're now working on the tower (which has a significantly smaller footprint than the podium), I gotta imagine this could conceivably be done quite early in 2021.
 
The glass going up is very green. Hopefully it's just for that lower section of the podium and not for the rest.
 

Back
Top