TOareaFan
Superstar
Nice try. It is the MLS podium roof with an exterior construction elevator... but close.
100% correct
Nice try. It is the MLS podium roof with an exterior construction elevator... but close.
I'd rather have anothe Telus clone than more of those green glassed condo clones.
Atleast if you are going to copy something, look at another city to copy from rather than the 2 neighbouring blocks.
Ice phase 2 will launch in November only for VIP agents and their clients
aA has consistantly stated at every point in the community process that the design for the office tower is NOT FINALIZED and that this will NOT BE THE FINAL DESIGN. It is merely a dressed up massing model showing the maximum dimensions of this tower were it to have a rectilinear floorplate.
consistency my friend... you are willing to give this project the benefit of the doubt but you are all over the 1 Bloor project! Thanks for the info though. Really I think we are in the same camp of wanting something different than the standard Toronto cube (perhaps with fins!) for both addresses.
thanks for the info CG ... but I'm getting sick of these VIP Agent's Preview crap ~ IMO, giving priority to RE agents over the general public purchaser is unfair and should be eliminated ... [/rant]
Atleast if you are going to copy something, look at another city to copy from rather than the 2 neighbouring blocks.
I love the relationship between the two residential towers. I love the relationship between the two residential towers and the office tower - which cleverly echoes the proportions of the TD Centre towers to the north. And I adore the big, angled cup holder tray that they all appear to rise out of. Serve it up!
thanks for the info CG ... but I'm getting sick of these VIP Agent's Preview crap ~ IMO, giving priority to RE agents over the general public purchaser is unfair and should be eliminated ... [/rant]
Designs for buildings of this size must have to go through the mandatory urban design review panel. Wouldn't they? Maybe the team needs to step it up a notch in their critiques.
Ice phase 2 will launch in November only for VIP agents and their clients
Construction starts in December, I was told