travis3000
Active Member
I would like to see some additional condos done in the X color scheme. I love the black, it adds a bit of sophistication and is nice to look at.
Hoarding has gone up at the menses project, so I think it is safe to assume it is in fact going ahead as planned.
I was referring to the fact that you said that there was rumours that the menkes building was going up on spec, in which I responded that it was. Apologies, I worded that incorrectly. 16 York (ice office tower) is currently looking for tenants and will not be built until it has a Tenent.
The City of Toronto has approved the revised massing of the office component and the proposed time-line for construction will commence before the residential towers are completed.