It's perhaps my favorite highrise condo this past year, with 1St.Thomas and Spire right up there as well. I wasn't expecting much from the MET- it was a huge surprise.
I'm not sure why the move in starts in September 2007, but maybe that will change based on how far along things seem to be. Edilcan did tell us that they wanted to have common areas like hallways etc. done before people move in.
It looks like the crane on the Met will be disassembled this weekend.
I noticed an appliances vehicle there this week, presumably delivering appliances. It's puzzling why move-ins are not scheduled until next fall.
I wouldn't be surprised if people are living there already. People were in the lower floors of ROCP I before they were building the finishing the top floors.
"You can see a little crane up there right now getting ready to take the big one down."
Any guesses when this might actually be happening? The preparations seem to be underway. Will they need to close off Carlton to do it? Will they time it to move the crane from the first phase to Encore?
They tend to do that on weekends. They shouldn't need to close down Carlton, and I guess they could theoretically re-use it on Encore, but I would imagine they'll send that crane back to the shop for cleaning and inspection before putting it up anywhere else.