Automation Gallery
Superstar
I'd love a Manulife supertall here. But I doubt it'll happen.
That would be nice, this location has been approved for a 290 meter structure, why except anything less.
I'd love a Manulife supertall here. But I doubt it'll happen.
Same here. I was fond of the last design. Now, in typical Toronto fashion, we'll get, at best, a watered-down version that won't look right because the proportions are off (see: Trump with its wretchedly outsized spire). Either that, or it will be a decade or more before something proper is built there. It's almost achingly predictable, and I feel foolish to have bought into the fervour two years ago. I'll be pleasantly shocked if Aura and ICE proceed sans complications.Am I the only person who is kind of depressed about this loss to the city? I think we all were very excited and looking forward to construction.
I'll be pleasantly shocked if Aura and ICE proceed sans complications.
Tridel's buildings generally don't turn heads but they're a quality builder and if a design competition was held or a design panel assembled to tweak a proposal, I think Tridel would do a great job. Likely less to become a victim of Toronto's infamous, The Cheapeningâ„¢.
If there was a competition for a design, I would be more okay with Tridel being behind it. That's the only way though.
Tridel's buildings generally don't turn heads but they're a quality builder and if a design competition was held or a design panel assembled to tweak a proposal, I think Tridel would do a great job. Likely less to become a victim of Toronto's infamous, The Cheapening™.
Tridel would build another 44 storey “300 Front St.†esque apartment building, turn a tidy profit and move on.
This sounds like every other builder.