Sept 3
With the amount of equipment sitting at the east end of the ramp along with spare parts, time will not be wasted in removing the existing decking before removing the steel beams this long weekend. More equipment was arriving as I was shooting the area after I left the ramp area.
They were sitting up other equipment next to the Keating channel as well for protection of not having material falling into the water.
It took me all week to find a day to get the last shots of the expressway before it came down and it was tight doing it that day.
The area is going to look a hell lot better with this section gone and when the rest get moves to the north. Still better off removing the whole things regardless of adding an extra 5-10 minute travel time for 30,000 drivers.
As for the removal of the Jarvis off ramp, it was plan to happen next year, but like other things, it can be push back a few years. Pinnacle north tower can't be built until the new ramp is in place as well the whole corner for Yonge and Lake Shore.
Don't know the time table for rebuilding Lake Shore over the Don, but will be in 2 phases. First phase would for one of the 2 bridges where traffic will be a single lane on one lane road while the other is lengthen and widen and shift upon completion to do the other lane. The rail bridge and the pedestrian/cycles bridge will be remove as well and replace with a longer one.