Northern Light
Superstar
Some not great news on the Kensington pedestrianization plans, updated August 6/24.
1) Construction is pushed off to Fall '25
2) The interlocking brick which I thought was a huge improvement has been removed from the design in favour of asphalt.
Some pedestrianization is still proposed, but this has really been watered down from what should have been Market Street 2.0
1) Construction is pushed off to Fall '25
2) The interlocking brick which I thought was a huge improvement has been removed from the design in favour of asphalt.
Some pedestrianization is still proposed, but this has really been watered down from what should have been Market Street 2.0
Kensington Market Safe Streets
Required road reconstruction and watermain replacement in Kensington Market presents a once-in-a-lifetime opportunity to redesign the streets in a way that puts pedestrians first, while supporting local businesses. After extensive feedback from local stakeholders and the public, the City is...
www.toronto.ca