News   Jun 24, 2024
 1.2K     0 
News   Jun 24, 2024
 908     0 
News   Jun 24, 2024
 569     0 

RBC Centre (LEED Gold, CadFair, 41s, KPF/B+H/&Co.) COMPLETE

I think the lower floors of Telus were significantly more complex and required much more work to build, tho that would only account for some of the lag
 
May 29

From Manulife
2542524071_58c2b4eb84_b.jpg


2549009204_140c303017_b.jpg
 
From that perspective I don't think much of the CN Tower will be visible at all. Maybe possibly from the upper observation deck and up, but not much more than that
 
So far this doesn't really look like the render...

i know it's great to have a 43 storey building under construction. but really.
it makes simcoe place look hot and sexy.
it looks just like the render...a big tubby glass box.
 

Back
Top