just east of the creek
Active Member
I drove past this site as well. As Tim noted, there are a lot of bales of straw, now seemingly all under tarps. So I am not sure if MTO is opening a feed lot operation or not...maybe not?
However, as complete to a lane shifting mode as the western side of the bridge and the bridge appear to be, the eastern side appears to be settling in for some period of work. They have moved offices, surveillance and lighting equipment into this area and tarped what looks to be a couple of trailer loads of straw bales. However, they appear to have completed all the noise abatement walls that were still incomplete a couple of weeks ago, so perhaps this is all directed at work underneath the bridge, pedestrian walkways etc. Regardless, it does not now appear as if they will be switching any east bound traffic flow to the rebuilt bridge at any time in the near future.
However, as complete to a lane shifting mode as the western side of the bridge and the bridge appear to be, the eastern side appears to be settling in for some period of work. They have moved offices, surveillance and lighting equipment into this area and tarped what looks to be a couple of trailer loads of straw bales. However, they appear to have completed all the noise abatement walls that were still incomplete a couple of weeks ago, so perhaps this is all directed at work underneath the bridge, pedestrian walkways etc. Regardless, it does not now appear as if they will be switching any east bound traffic flow to the rebuilt bridge at any time in the near future.