News   Jan 28, 2026
 647     1 
News   Jan 28, 2026
 1.6K     5 
News   Jan 28, 2026
 724     1 

PATH Network Expansion (various, various, various)

Walls were poured over the weekend. Roof is being assembled in preparation for subsequent pouring.

20200505_123634.jpg
 
Getting ready to pour concrete today. With some luck, we maybe heading closer to reopening that stretch of York street. However, lanes are still reduced to one in each direction just North of Bremner due to bridge repairs.


20200513_112032.jpg
 

Back
Top