OCCheetos
Active Member
I don't think we'll see the same level of delay with the trains as we saw with the Confederation Line Phase 1. These trains are pretty standard 'off-the-shelf' units, and it's not like the Swiss don't have experience dealing with extreme weather ranges.
If this project is going to be delayed at all, I would think it would be with the civil works.
The FLIRTs were modified (structurally) for the North American market, so I'm sure we'll see an article about how this specific assembly of parts has never operated anywhere else in the world /s