Update from this morning’s GO ride: the second cutter head is lying face down on the surface, alongside what looks like the front sections of the second TBM.
"Howdy, neighbour!
Right on the other side of this wall is TTC’s Pape Station. We recently exposed the existing Line 2 subway station structure, and we will continue to dig down to uncover the entire station. It’s a delicate operation, but with careful excavation around the active station and installing additional supports, we'll be able to get safely underneath it to build a new Ontario Line connection."