M1+M2+Metropolis+Parkside@Metro Place (Allen&Sheppard, Liberty, 14+2x16+17s, Kirkor) COMPLETE

I thought it was about time to head north of the 401 for a little photography. Here's the latest at Metro Place.

Buildings M1 and M2 are seen here from Idomo:

MetroPlaceM1M2.jpg



PDIs are currently taking place at M1. From Sheppard:

MetroPlaceM1pano.jpg



M1 left, M2 right:

MetroPlaceSheppard.jpg



Work on the porte cochere at M2:

MetroPlaceM2Door.jpg



Basement level work on Metropolis, the third phase at Metro Place:

MetroPlaceExcav.jpg


MetroPlaceCrane.jpg


MetroPlacepano.jpg



At the north end of the site, the crane is in for Parkside, the fourth and final tower at the site:

MetroPlaceN1pano.jpg


MetroPlaceN2pano.jpg



Work progresses on M1 and M2:

MetroPlaceCloseUp.jpg


MetroPlaceWorker1.jpg


MetroPlaceWorker2.jpg


MetroPlaceWorker3.jpg


42
 
if you look at Sheppard heading toward Yonge Street, there are a lot mid-rise condo buildings...

It fits well into the area.
 
Question about address and how do a proper transition...

M1 e M2 Addresses

Hi folks,

I'm waiting for October 12th to join you guys in M2 15th floor. I have a silly question, how did you guy manage your mail address during this transition phase?

Can we start forward message to the new address in a couple of weeks in advance? By the way, what is the address and postal code of our community?

Cheers,
Lidiana
 
January 23 2011 update

These towers sure are rising quickly ~

Metropolis (M3) @ 14th floor
IMG_5180.jpg

Click to Enlarge


Parkside (M4) @ 8th floor
IMG_5187.jpg

 
hey thanks for the photos. I am moving into M3 in 2012 and don't get to the site often...good to know it is going up

have my appt to pick colours etc in late March... hope they have something I like.
 