ssiguy2
Senior Member
Good news for London area transit. The Wellington Gateway {southern BRT route} is beginning construction this month with the first section opening by 2025. The East Link is already well under construction and could begin operations in less than 18 months. The Downtown Loop will be done later this year and began first because the other 2 trunk routes can't operate downtown without it.
Also St.Thomas is FINALLY getting serious about a desperately needed route connecting to London and is meeting with Mulroney to get seed money. The mayor has stated that it must come VERY fast as Amazon opens it new massive facility near the city on the main highway to London which will employ a numbing 2,000 24/7 workers by the end of this year and right now there is not a single bus to get anybody there from St.Thomas or London.
London has wanted a service between the 2 for a long time but has balked at bringing it in because there is about a 2km gap between the City and St.Thomas boundaries and, understandably, doesn't feel like providing a service to Elgin county that the people in Elgin won't have top pay for but Londoners would.
Also St.Thomas is FINALLY getting serious about a desperately needed route connecting to London and is meeting with Mulroney to get seed money. The mayor has stated that it must come VERY fast as Amazon opens it new massive facility near the city on the main highway to London which will employ a numbing 2,000 24/7 workers by the end of this year and right now there is not a single bus to get anybody there from St.Thomas or London.
London has wanted a service between the 2 for a long time but has balked at bringing it in because there is about a 2km gap between the City and St.Thomas boundaries and, understandably, doesn't feel like providing a service to Elgin county that the people in Elgin won't have top pay for but Londoners would.