TransitPolicyChanger
Active Member
IIRC only the first two tracks closest to Union will be restored with wood as the original shed was; and the remainder will be metal with the green roof on top.
Hopefully someone can confirm.
Actually a project I am working on - and you are correct that the roof of these 2 tracks (track 1 and track 2) are being rebuilt to match the original (heritage requirement/compromise) - this work also included restoring the "smoke vent panels" - those large concrete sections above the tracks