Did you say that though? It at least doesn't appear you made any edits and you never mentioned subgrade?
Where the "subgrade" at?
Of course you didn't say that. I said that, and I wasn't aware subgrading deteriorates.
I still think the bridge should be built with room for a fourth track. Many rail bridges still retain extra room for a few extra tracks. But he was not responding to that, he was specifically responding to my comment about subgrading without concrete plans to actually put in a rail. You can still leave extra room for new tracks and build wider bridges.
Where the "subgrade" at?
I agree. Track doesnt need to be layed / ballasted but factoring in future expansions is what often saves so much money in the future. It was disappointing to me when I saw that Long Branch was being rebuild the same way (1 side + 1 island platform) which will mean it will also have to be rebuilt for 4 track service. It also confuses me because Long Branch does not need access to three tracks.
However, i'm not too aware of what service is currently possible with three tracks, and capacity improvements via ETCS. But it already is a busy line and 4 tracks could easily enable all-day express service.