SubHuman
Active Member
... a line where construction is currently underway to continuously double-track the line from Union to Aurora.
There's been some progress where the Barrie line splits off from the Kitchener line near Dundas and Lansdowne.... It's somewhere between ominous and outrageous how they are maintaining radio silence on actually completing the double track.
Sure looks like the plan is on hold...
However, nothing yet immediately to the north going up towards where the Bloor/Lansdowne GO station is being built, and it looks like it might be more complicated with limited space available.
I assume the new second track will likely be on the east side of the existing track all the way up to Bloor, but it's difficult to tell if there's enough space to do that while leaving all of the existing track in place.
https://urbantoronto.ca/forum/threa...-1s-metrolinx-brown-storey.37395/post-2238867
Last edited:




