crs1026
Superstar
Jan 14
Took a look at Etobicoke North Station and area. I have no idea if that industrial track is still used as I saw no cars for the 2 tracks where it ends.
It is used, just not every day. I'm not sure if that warehouse has long term occupancy - but the plan has always been to retain that service track after the fourth track is squeezed in between.
The fourth track was planned (I have seen some official drawings) to be an extension of the runaround track that already exists west of the station. The service track, which is currently connected as the northmost track at the Wice interlocking, would be shifted and extended on the north side all the way to Halwest, and the fourth track would be tied in using the current signal from the service track and the fourth track (northmost track through Wice, which is currently tied to the service track) would be used through the interlocking. West of Wice, the existing service track would become the third main track through Malton and would end at a new turnout onto the existing T2 at Halwest
The problem being....to put this track segment in place, the Etobicoke North platform has to go.
- Paul
Last edited: