Highlights as far as I can tell:
- Metrolinx has started the procurement process to find a construction partner for the required rail infrastructure for the Bowmanville Extension project. The procurement process to identify a construction manager kicked off with a Request for Proposals (RFP) released in April 2022. The method of procurement for this RFP will be the Construction Manager at Risk (CMAR) model.
- As part of the ongoing Transit Project Assessment Project (TPAP) addendum, there will be public information centre held in late 2022.
- The CMAR procurement delivery model allows for a collaborative approach between the construction manager (contractor) who comes onboard in the design stage of the project to assist with early problem solving, reducing the potential for risks during the construction stage of the project.
- During the design stage, the contractor works closely with Metrolinx on potential solutions to design challenges – allowing for innovation, efficiency, and quality management throughout the design process.
- Near the end of the design stage, the contractor will provide an estimated construction schedule and associated costs for the proposed work – at which time, Metrolinx and the contractor will negotiate terms of a construction contract, including a target price, or guaranteed maximum price (GMP) for the construction stage of the work.
- As the scope of work for the Bowmanville Extension is very complex – this model allows the contractor to be engaged early in the design process, increasing efficiency of construction staging and sequencing, and providing better cost certainty for the proposed work – making CMAR an ideal delivery model for this project.
- The construction is anticipated to kick off following the design phase.