Garuda
Active Member
Went for a private flight today to see the fall colours and made a point to check out the construction in Waterloo and Guelph.
Future Breaslau Station
I hope this gets built soon. I understand that Metrolinx wants the developer to the north to fund part of this station. With service increasing the region needs a true park and ride station much sooner than later.
Guelph Central Station:
You can see that the 2nd track has been laid up until the end of the platform at the north of the photo (west end). More spans need to be replaced for the 2nd track to be extended west up to the Hanlon.
Speed River Bridge:
2nd last span is being replaced. Soon the traffic nightmare will be over. To the left of the end of the eastern end of the platform (below the red brick building) is the staging area for the span replacement and soon to be used for the 2nd platform. They should announce construction soon (fingers crossed).
Future Breaslau Station
I hope this gets built soon. I understand that Metrolinx wants the developer to the north to fund part of this station. With service increasing the region needs a true park and ride station much sooner than later.
Guelph Central Station:
You can see that the 2nd track has been laid up until the end of the platform at the north of the photo (west end). More spans need to be replaced for the 2nd track to be extended west up to the Hanlon.
Speed River Bridge:
2nd last span is being replaced. Soon the traffic nightmare will be over. To the left of the end of the eastern end of the platform (below the red brick building) is the staging area for the span replacement and soon to be used for the 2nd platform. They should announce construction soon (fingers crossed).




