Fritter
Active Member
I am speculating, but I believe the tunnel in Guelph might be locked outside of train times due to a number of safety and security incidents there lately.
Apparently I heard that homeless people were sleeping in the tunnelI am speculating, but I believe the tunnel in Guelph might be locked outside of train times due to a number of safety and security incidents there lately.
Apparently I heard that homeless people were sleeping in the tunnel
Then the problem is not the tunnel, its a lack of housing for the un-homed!
I get that that is not Mx's mandate, but it would look better on them to find (pay for if needs be) a social worker to get those needy individuals proper housing and support, rather than locking the doors.
The problem is not alot of them want to take the offers of support as evidenced by attempts made at encampments in Toronto.
Union Pearson express uses the track between union and highway 427 and the north track might be closed off at Weston for constructionFollowing VIA 87 online today, it doesn't look like the Guelph 10 mph slow zone has been lifted yet. Which explains why the September GO schedules haven't updated the travel time between Kitchener and Guelph.
(Times are 6 hours off because my computer is set to Central European Time). Screenshot was taken was 19:05 EST
View attachment 346613
The current AM Peak GO train travel time from Kitchener to Union is 1h41, which is 9 minutes faster than before construction started. But a couple of those minutes were dropped in mid 2020 due to reduced ridership, and thus reduced dwell times at stations. Lifting the Guelph slow zone should save about 3 minutes, so the original promise of saving 10 minutes thanks to this construction project seem to be spot-on.
P.S. I am consistently impressed by how many delays VIA trains manage to accumulate along the GO-owned Weston Subdivision on weekends/holidays when they are literally the only trains on the track.
While riding VIA 87 on weekends I've noticed that it follows the same track assignment as on weekdays, which means that it switches back and forth between the centre and north tracks in order to overtake nonexistent GO trains.Union Pearson express uses the track between union and highway 427 and the north track might be closed off at Weston for construction
The reason its lock after service, the Homeless sit up housing there. Been there a few times and wanted to use the tunnel for shorter walking distance, but had to do the long way. Also ran into the homeless when it was open and not fun.Guelph, 2 September 2021:
Crews were working on the bridge east of the station.
View attachment 346221
Platform edge work is also underway on the west end of the platform. Also note the small segment of the second platform over Wyndham street which was already built as part of the station's renovation in 2012.
View attachment 346246
Looking back toward the current (north) platform from the stub of the new (south) platform. Photo taken from the top of the staircase up from Wyndham street which was built to access the future south platform
View attachment 346225
Speaking of futureproofing for the second platform, here's the pedestrian tunnel which was also opened in 2012.
North entrance:
![]()
South entrance:
![]()
For some reason, the tunnel entrances are locked during the midday. Apparently it hasn't occured to Metrolinx that someone might want to access the station even during times of day when there are no train departures. Like for example to take GO bus routes 29 Guelph-Mississauga or 33 Guelph-Brampton which each run hourly throughout the day. Or to access basically all Guelph Transit routes.
The Sheppard overpass has a lot to due with the lack of the 3rd track as well north of the station. Both ends are pinch points to get that 3rd track in as well there is a walkway of the east side of the east platform that connects to Sheppard.^Really nice video, gives a good view of what’s happening and what isn’t.
Hard to understand why they are dawdling with the track construction sout of Ellesmere.
More troubling is the lack of progress on those creek bridges.
I’m also surprised how the clearances don’t allow a third track at Agincourt.
- Paul
Tracks 2, 3 and 4 are in operation and have been since day one for Weston station. Track 1 is not completed and will not be completed until the new east platform is finish at Weston station.. Tracks at both ends in place other than the station.Union Pearson express uses the track between union and highway 427 and the north track might be closed off at Weston for construction