nfitz
Superstar
We gave up trying to change him years ago ...Yeah, I completely understand that! I was also just following what other posters were doing in this forum; like the one before mine. Thanks for the advice though!
We gave up trying to change him years ago ...Yeah, I completely understand that! I was also just following what other posters were doing in this forum; like the one before mine. Thanks for the advice though!
I'm seriously wondering what is going on with Confederation GO. We are over a year now since Metrolinx announced it was out for tender and not a peep from them.June 15
Confederation Station is still dead in the water and sitting on an empty lot.
No work has started on Kerr St Grade Separation yet. It either prep work for the grade separation or general upgrading on either a transmission Gas or oil line that is taking place east of Kerr St north-east of track 3. I am assuming the new bridge will support 4 tracks or maybe 5 to meet future needs.
It will be interesting how the tracks will be shifted to allow the new bridge to be built as well how many. There will be at least 2.
Photos to follow.
I'm seriously wondering what is going on with Confederation GO. We are over a year now since Metrolinx announced it was out for tender and not a peep from them.
It could be a number of things starting with COVID-19. Not cheap to build a station only to have it sit unused for a number of years. Then, maybe CN is not in the position to install tacks for the station and what good is having a station in place with no tacks too it?I'm seriously wondering what is going on with Confederation GO. We are over a year now since Metrolinx announced it was out for tender and not a peep from them.
Interesting that it's back to the future at this location since a 4th track will be reinstalled. Of course I assume when this picture was taken the fourth track wasn't the main line track. Also, the OL tracks will be added to the left.
View attachment 328829
This is where they are going to try to fit the Ontario line in. Photographic evidence that the line won't fit and the trees are already gone.Interesting that it's back to the future at this location since a 4th track will be reinstalled
this is at Queen and Strange St. Very far from Guildwood. Nice to see how much greener the areas got.Interesting that it's back to the future at this location since a 4th track will be reinstalled. Of course I assume when this picture was taken the fourth track wasn't the main line track. Also, the OL tracks will be added to the left.
View attachment 328829
You may wish to share w/the poster............I'm fairly certain this is nowhere near Guildwood.
That appears to be NB/EB approaching Queen Street East.
The track on the left is diverging for the old platform (long removed even by then) on the Overpass.
The seemingly large apartment building, I think, is 444 Logan, 21 storeys, still up today. (Though reclad)




