Until they get thing done to the east of this bridge, useless to have a 2nd bridge at this time other than erection cost and the cost of the bridge. Also, less disruption to do it once than twice. To put in the 2nd bridge at a later date is not hard to do other than more road and sidewalk closure.I’m with ML on this one.
They are replacing the crossbeams, which means they have enabled a second span when it’s needed. That’s sound futureproofing.
But why procure and install spans that their analysis says they won’t need for years yet.
We know they are not doubletracking the line at this time. The service plan doesn’t require that.
We are a long ways (and a lot of money) from headways that demand full double tracking.
I will be a whole lot happier when they get sidings and other things done, so that there is useful counterflow service. There’s too much delay just to get that done. We don’t need scope creep - first things first.
- Paul
What could happen is that a double track bridge will replace the current one with the 2nd track added down the road.
What is money to ML these days to do things?
Once work starts on the south platform this years, things will look a lot better in 2022.
To double track to the west means buying property.