robmausser
Senior Member
I would like to point out that the RHill line takes significantly longer to get downtown than Barrie line due to various reasons. Gormley to Union is 58 minutes, Newmarket to Union is 59.
The plan was to use Leaside Spur, a bit of new track along CP branch and route the Richmond Hill train down the purchased CP Don Branch to straighten it out and avoid all of the mess that is the lower don flood plain. It would make the trip comparable to Barrie Line.
Unfortunately a rail trail (im a biker and use it often but I can still see it's merit for RH line) work needed on the bridge and track, and dealing with CP made the prospect very difficult.
I could only see the Leaside Spur ever be used if it was 100% electric EMU's, and they still were able to fit the trail in beside the tracks.
So, 2050 anyone?




