It’s the only time it crosses the Grand River so I assume yes!^ This one?
Google Maps
Find local businesses, view maps and get driving directions in Google Maps.maps.app.goo.gl
View attachment 451167
It’s the only time it crosses the Grand River so I assume yes!^ This one?
Google Maps
Find local businesses, view maps and get driving directions in Google Maps.maps.app.goo.gl
View attachment 451167
Yeah that's about mile 58 on the Guelph Sub and as far as I know the only bridge there...^ This one?
Google Maps
Find local businesses, view maps and get driving directions in Google Maps.maps.app.goo.gl
View attachment 451167
^ This one?
Google Maps
Find local businesses, view maps and get driving directions in Google Maps.maps.app.goo.gl
View attachment 451167
IT IS FINALLY HAPPENING - Metrolinx has posted the construction tender for the Bloor GO/Dundas West TTC tunnel connection. Closes April 13th.
https://www.metrolinx.merx.com/public/solicitations/2391819420/abstract?origin=0
PT-2021-NAFD-378 - PT-2021-NAFD-378: Bloor GO (TTC Connection)
Keep in mind, they promised this back in the 1970s and started working on the connection in 1974, and roughed it into the Crossways building. Though with no facility for an elevator in the design, they have to start from scratch.
Also recall the 1985 negotiations that the Ministry started with Crossways to do this ...
Started in 2015 ... LOL!
Overnight Geotechnical Investigation within Barrie GO Rail Corridor
January 22, 2023 – February 02, 2023
What to Expect
Crews will use a track mounted drill rig to perform the investigation works. The work zone will be safely delineated.
Customers and residents may experience some noise and vibration from construction vehicles and equipment. Site lighting will be positioned away from residential properties. Site-based noise mitigation measure will be implemented to minimize the disruption as much as possible.
There may be some limited day work, expected to take place Monday to Friday between 7:00 a.m. and 5:00 p.m. Overnight work will be required for safety when there is no train activity, and is expected to take place Monday to Saturday between 11:00 p.m. and 5:00 a.m.
Work may be rescheduled or extended due to weather conditions or unforeseen circumstances.
I shot it in Dec and still had a lot of work to do for all the platforms. Still have the north sidewalk close off.What's the status of Mt Dennis GO station?
Could be late this year or in 2024 before the track work begins, considering its takes about 2 years to do a station with thhis one been very slow so far.More like a “lack of update”. No change since the summer for tying in the stub tracks at West Harbour. Photo from James Street looking east.
View attachment 451680
At this location we may have 3 tracks once the West Harbour tracks are extended, but only for a short distance. During the Confederation GO construction announcement, it was stated that the planned 3rd track addition between West Harbour and Confederation wasn't proceeding. Regardless, through freight traffic isn't frequent at all, and GO only really has to contend with switching by CN.Could be late this year or in 2024 before the track work begins, considering its takes about 2 years to do a station with thhis one been very slow so far.
Since VIA and CN only have a few trains on this line, you can get away having 3 tracks, but a 4th would be nice. To put in a 4th track will require a number of overpasses to be rebuilt as well the corridor.
Small update from GO here:More like a “lack of update”. No change since the summer for tying in the stub tracks at West Harbour. Photo from James Street looking east.
View attachment 451680