generalcanada
Senior Member
wait what?![]()
A bridge and a deal: Metrolinx’s plan to get GO trains across Hwy. 401
After years of work and study to bring the GO train north of Hwy. 401 in Oshawa, there’s a plan and an agreement to make it happen.www.durhamregion.com
"Originally, it looked as if GO trains couldn’t get over the GM bridge with its sharp bend and steep incline. Metrolinx worked out a way to get lighter, shorter passenger trains across the spur bridge."
Would this mean new rolling stock? Maybe they would use UP Express equipment from Bowmanville to Oshawa if it's replaced by electric rolling stock as part of the On Corr deal?
"The GM bridge reopening means Metrolinx will build a second bridge right next to the spur bridge, which may be a better way forward, according to Verster. It means passenger trains won’t have to pull over to wait for freight trains to pass. Operationally, the GO trains and CP freight trains will be very separated as they cross the highway."
UPDATE: Just realized this was posted in the GO Service thread.
Wasnt the main reason to use that gm spur instead of the old plan of crossing the 401 and closing the go station because they didnt have to build a large bridge over the 401?
if they have to build a new bridge, What the hell was the point of redrawing the bowmanville business case over the last 2 years




