mdrejhon
Senior Member
It looked barely wide enough; you will need to shift the existing trackage sideways, possibly little trenching, and shift some support structure (e.g. boxes, overheads), but it does look like a 2nd track can be squeezed in without expropriation in most cases. A good solid sound barriers will be required, otherwise, a kid in the backyard could theoretically reach over a backyard fence and touch a GO train!it doesn't require expropriation. Just sound barriers.
The corridor is wide enough for 2 tracks for its entire length.
Last edited: