Coolstar
Senior Member
No 13 was given to the Avenue Rd route.13 is available now that Bay is going to be 19 instead of 13.
No 13 was given to the Avenue Rd route.13 is available now that Bay is going to be 19 instead of 13.
I believe the split of the 36 Finch West was due to the subway extension. Also, there’s less ridership on the Yonge-Keele segment than the rest of the route (if it wasn’t, there’s be more thru-service outside select periods). Also, I’d like to go on a hunch and guess that non-local trip patterns would transfer to Line 1 at Finch West to reach their destination.And the reason they split it at Finch West isn't necessarily dictated by the established travel patterns, or by where the majority of riders want to go. I can think of two other reasons.
First, a completely sensible one, but temporary: construction-related disruptions. Splitting the route spares the Keele - Yonge section from those distructions, and also makes the management of the west-of-Keele section a bit easier.
And the second reason: they might want the riders to get used to transferring at Finch West. After the Phase 1 of LRT opens, the riders will not bug Metrolinx with requests to extend to Yonge, until Metrolinx actually gets the funding for such an extension.
Ah, right. What was the original planned number for Bay?No 13 was given to the Avenue Rd route.
I don't know. Pretty sure there never was a planned replacement number for Bay until now with the 19 designation.Ah, right. What was the original planned number for Bay?
For how complete the MSF yard is, the rest of the line seems to be severely lagging behind. They've only got small sections of the LRT tracks poured, with most of Finch Ave W still going through preparation works. We have a long way to go before we see LRTs actually running on Finch West even for testing purposes.
MSFs are always constructed way before the rest of the line is ready as they will start housing any rolling stock received during construction.For how complete the MSF yard is, the rest of the line seems to be severely lagging behind. They've only got small sections of the LRT tracks poured, with most of Finch Ave W still going through preparation works. We have a long way to go before we see LRTs actually running on Finch West even for testing purposes.
They claim to be at 33% complete. Once the road is ready, getting the tracks done will be fast. If anything holds this project up it should be the below grade terminals.For how complete the MSF yard is, the rest of the line seems to be severely lagging behind. They've only got small sections of the LRT tracks poured, with most of Finch Ave W still going through preparation works. We have a long way to go before we see LRTs actually running on Finch West even for testing purposes.
There is a capacity for 27 light rail vehicles. Alstom will provide 18 LRVs for the Finch West LRT line.Metrolinx claims that the Finch West LRT MSF site was built with "Expansion Capabilities".
Looking at the renderings and drone footage, how is this possible? It looks almost maxed out to me.
Thanks
Actually, in the meantime, they can store snowplows, sidewalk plows, etc. in the unused space.There is a capacity for 27 light rail vehicles. Alstom will provide 18 LRVs for the Finch West LRT line.
In the meantime, they can store your garden furniture during the winter, or your snow shovels during the summer.
From link.