Wondering if anyone here has experience of the installation of EVCS in a multi-unit building, particularly in assigned (or owned) parking spaces. There are, of course, several basic issues:
How much spare power does the building have? (i.e. how many chargers can it currently support);
Installation of the basic infrastructure (conduit and wiring) - installed by each owner or the building?
Selection of the building's preferred vendor;
Installation of the actual chargers and then paying for (charging back) the hydro used.
How much spare power does the building have? (i.e. how many chargers can it currently support);
Installation of the basic infrastructure (conduit and wiring) - installed by each owner or the building?
Selection of the building's preferred vendor;
Installation of the actual chargers and then paying for (charging back) the hydro used.