TwinHuey
Active Member
Yup. It's to get over the GO corridor, and is the main cause of why this project is so insanely delayed. The TRCA initially envisioned a level crossing of the corridor and Metrolinx said no far too late into the process to avoid massive delays, plus now you get these ridiculous structures.
Do you know if a tunnel is planned for this crossing? No activity there when I took the drone shots on Dec 2.