It's great to see that my tax dollers will finally give Scarborough the transit they deserve.
I mean it will have by the time it actually shuts down. Construction should *finally* begin by end of this year from my understanding.Most offensive part of this is that the SSE hasn't even begun construction yet.
This thread should be renamed, TTC: Scarborough Bus Screw Job, formerly SRT Replacement
Subway haters. That’s true. The downtown elites hate subways. That’s why the Ontario line isn’t using subway tech and is above ground in some places downtown. Good thing those downtown elites didn’t ruin the grand vision of Scarborough.There exists a thread called "Debate on the merits of Scarborough subway", created specifically for the subway-haters. But they do not want to use that thread.
Perhaps they should wait until Eglinton East LRT is complete.
Eglinton east was never going to be constructed before the central portion which is yet to be complete so I don’t know how it could have been prioritized under Miller. Blame everything on Miller. It’s all the big lefties fault. The world has done much better with fords and trumps in charge.They should have prioritized EE LRT many years ago. That was possible under Miller (instead of Sheppard East), then again once Rob Ford left the office in 2014/2015, but never really took hold.
Now it is too late, even if they finalize the design and start construction ASAP, it won't be built sooner than 2028-2029.
Subway haters. That’s true. The downtown elites hate subways. That’s why the Ontario line isn’t using subway tech and is above ground in some places downtown. Good thing those downtown elites didn’t ruin the grand vision of Scarborough.
Eglinton east was never going to be constructed before the central portion which is yet to be complete so I don’t know how it could have been prioritized under Miller. Blame everything on Miller. It’s all the big lefties fault. The world has done much better with fords and trumps in charge.
Most offensive part of this is that the SSE hasn't even begun construction yet.
Both conservative parties which allegedly are pro subway and pro suburb.That's true, and not related to the choice of technology or route. The endorsement of SSE came in 2013, it is 2021 now, it should have been in the middle of construction by now if both th city and the province did not drag their feet.