robmausser
Senior Member
I still think either rebuilding the RT or converting to LRT was a far better idea at a cheaper cost than this. But we're too far down to go back. At least the 3 stop proposal is better than the 1 stop proposal.
Rebuilding, modernizing and extending the RT to Malvern TC was the best option, and was approved and outlined by the TTC way back in 2006. Oh well.