Do you have any insight into why this stopped at Pharmacy? And not Vic Park? I get after that there is the 404 and they need to figure out a way to cross that (id go north up the grass boulevard of Gorden Baker and then across on McNicolls overpass), but it seems weird to me to stop this project one street further east than need be.
Not really sure. I've been around the scene long enough to have seen all sorts of different segments considered (phasing). At one point, in 2012, Don Trail to Birchmount was a preferred segment (doubtful and crossing the 404 was always going to be complicated and expensive, but it was hypothetical I suppose). I remember a VP -- Birchmount variation too. It got truncated due to some hassle or another........lets just get this easterly bit done...... (then that took a few more years).
When I look at the Pharmacy to VP segment, I see a potential issue. The City has chosen to run the trail almost entirely at the north end of the corridor here. But on the VP approach would have to cut well to the south to go around a parking lot already permitted in the corridor (not the City's)
The above would require a new mid-block set of lights, as the trail wouldn't be near to any existing set.
That would certainly add some costs.
There may have been other complications. Its an old design.........
It goes back at least 3 managers ago for the City Cycling Unit.............and it might even be 4.
The design drawings are from 2017.