That's one horror story mattnmags. I do think that they got sloppy on the last two floors. They are doing deficiency work, slowly, and more painting than anything else from what I can tell. But it's a shame. At this point in the project, the trades are on the way out, the developer is thinking about the next project, the PM company is there on a tentative basis, and hired for limited work...hopefully it will all be good soon.
I'm worried about building issues that are also not up to par. Not sure who takes ownership of those problems, works to get them done. Elevator button panels on each floor are loose, one elevator badly scratched, aluminum door/window structure in parking area are not trimmed at the bottom, you can see shims. Outside, the building is dirty. At the front entrance, the canopy painting is not done, and you can still see yellow foam. Look at the elevator floor display outside the right hand elevator on G. It is hanging, there are two screws in the plate, but nothing behind, the hole was cut too big.
At the side of the building on Church, look at the joint between the wall and sidewalk. It looks unfinished. Damage to the ceiling by the parking entrance. A lot of painting still to be done especially on G and lower on door frames. Now the cold weather is here, the exterior stuff is probably on hold.
We are up to 25 owners as members of the facebook group for berczy. Come and join, I will add you.
https://www.facebook.com/#!/groups/BerczyCondo/
Harry
I'm worried about building issues that are also not up to par. Not sure who takes ownership of those problems, works to get them done. Elevator button panels on each floor are loose, one elevator badly scratched, aluminum door/window structure in parking area are not trimmed at the bottom, you can see shims. Outside, the building is dirty. At the front entrance, the canopy painting is not done, and you can still see yellow foam. Look at the elevator floor display outside the right hand elevator on G. It is hanging, there are two screws in the plate, but nothing behind, the hole was cut too big.
At the side of the building on Church, look at the joint between the wall and sidewalk. It looks unfinished. Damage to the ceiling by the parking entrance. A lot of painting still to be done especially on G and lower on door frames. Now the cold weather is here, the exterior stuff is probably on hold.
We are up to 25 owners as members of the facebook group for berczy. Come and join, I will add you.
https://www.facebook.com/#!/groups/BerczyCondo/
Harry