gregv
Active Member
Beltline ‘Lost Stations’ Project
2019 planning statement:
“The Beltline ‘Lost Stations’ Project is a way to highlight the trail’s railway history and the communities it runs through, and to enhance and bring a sense of place to the trail for future generations. Using three ‘lost stations’ between Eglinton and Mount Pleasant as focal point, a design concept is being created to celebrate the historical, cultural and botanical features of the Beltline.”
Preliminary Design (2019 PDF):https://joshmatlow.ca/wp-content/up...LINE-STATIONS-PRESENTATION-PANELS_reduced.pdf
Recent BlogTO post:
There are 3 “stations” currently under construction - Yonge, UCC and Eglinton. More possible in the future if these are successful.
Josh Matlow's newsletter update yesterday:
"...the construction of the Beltline Trail Lost Station at Yonge and Upper Canada College is going very well and most of the construction should be completed by the end of September, weather permitting. The Eglinton Beltline Lost Station is expected to be completed by the end of the year."
Pic of Yonge on September 11:
2019 planning statement:
“The Beltline ‘Lost Stations’ Project is a way to highlight the trail’s railway history and the communities it runs through, and to enhance and bring a sense of place to the trail for future generations. Using three ‘lost stations’ between Eglinton and Mount Pleasant as focal point, a design concept is being created to celebrate the historical, cultural and botanical features of the Beltline.”
Preliminary Design (2019 PDF):https://joshmatlow.ca/wp-content/up...LINE-STATIONS-PRESENTATION-PANELS_reduced.pdf
Recent BlogTO post:
This Toronto trail is getting new platforms where old train stations used to be
The Belt Line Railway was a small blip in Toronto train history: the commuter rail service, which was built in 1892, only operated for about 28 mon...
www.blogto.com
There are 3 “stations” currently under construction - Yonge, UCC and Eglinton. More possible in the future if these are successful.
Josh Matlow's newsletter update yesterday:
"...the construction of the Beltline Trail Lost Station at Yonge and Upper Canada College is going very well and most of the construction should be completed by the end of September, weather permitting. The Eglinton Beltline Lost Station is expected to be completed by the end of the year."
Pic of Yonge on September 11:
Last edited: