Or, I'm seeing less and less of freight in the cards. Coexisting with freight was more feasible back in the original VIA HFR days when the design was vanilla railroad and the freight was compatible with the intended passenger equipment and roadbed. With Alto's design trending towards upper end HSR, the tracks would not be compatible with heavier bulk freight.
The mineral freight that is carried out of Havelock is partially transloaded already. It would be simple to have the transload point shift to the Belleville Sub. Road capacity and congestion is really not a concern out that way.
- Paul
Banning freight from Alto tracks wouldn't just affect the Havelock Sub. CN actively uses the VIA owned sections of the Alexandria, Beachburg and Smiths Falls Subs. Would Alto ban CN from serving Ottawa (and consequently Nylene in Arnprior) or would they build new tracks for Alto and maintain VIA's existing tracks for CN to use?